Document Control Procedure
Document Type: Procedure
Version: 1.0
Last Updated: February 2026
Distribute To: Project Managers, Project Engineers, Admin
Purpose
Establish procedures for managing project documents to ensure the right information is available to the right people at the right time.
Document Control Principles
- One Version of Truth - Single source for current documents
- Controlled Distribution - Track who has what
- Revision Management - Clear superseded documents
- Easy Access - Findable and retrievable
- Secure Storage - Protected and backed up
Document Categories
| Category | Examples | Retention |
|---|---|---|
| Contract | Contract, exhibits, amendments | Permanent |
| Design | Drawings, specifications | Permanent |
| Submittals | Shop drawings, data | Project + 6 years |
| Correspondence | Letters, emails | Project + 6 years |
| Administrative | RFIs, meeting minutes | Project + 6 years |
| Financial | Pay apps, change orders | 7 years |
| Daily Reports | Field reports | Project + 6 years |
| Photos | Progress, issues | Permanent |
Folder Structure
/[ProjectNumber]_[ProjectName]/
│
├── 01_Contract/
│ ├── 01_Original_Contract/
│ ├── 02_Amendments/
│ └── 03_Insurance_Bonds/
│
├── 02_Drawings/
│ ├── 01_Bid_Set/
│ ├── 02_Contract_Set/
│ ├── 03_ASIs/
│ ├── 04_Bulletins/
│ └── 05_As-Builts/
│
├── 03_Specifications/
│
├── 04_Submittals/
│ ├── [By_Spec_Section]/
│ └── Submittal_Log.xlsx
│
├── 05_RFIs/
│ └── RFI_Log.xlsx
│
├── 06_Change_Orders/
│ ├── PCOs/
│ └── Approved_COs/
│
├── 07_Meeting_Minutes/
│ ├── OAC_Meetings/
│ └── Coordination/
│
├── 08_Correspondence/
│ ├── Owner/
│ ├── Architect/
│ └── Subcontractors/
│
├── 09_Daily_Reports/
│
├── 10_Photos/
│ └── [By_Month]/
│
├── 11_Financial/
│ ├── Budget/
│ ├── Pay_Apps/
│ └── Cost_Reports/
│
├── 12_Safety/
│
└── 13_Closeout/
Drawing Management
Drawing Sets:
| Set | Description | Status |
|---|---|---|
| Bid Set | For bidding | Superseded |
| Contract Set | Issued for construction | Current (unless updated) |
| ASI Drawings | Architect's changes | Additive |
| Bulletin Drawings | Owner changes | Additive |
| As-Built Set | Final record | Final |
Drawing Log:
| Dwg # | Title | Rev | Date | Issued By |
|---|---|---|---|---|
| A-101 | Floor Plan L1 | 0 | 1/1/26 | ABC Arch |
| A-101 | Floor Plan L1 | 1 | 2/1/26 | ABC Arch |
Distribution:
- Field set (current, marked)
- Office set (current)
- Archive (all revisions)
Revision Control
Superseded Documents:
- Stamp "SUPERSEDED"
- Remove from active use
- Archive (don't destroy)
- Distribute current version
Revision Tracking:
- Log all revisions
- Date received
- Changes noted
- Distribution tracked
File Naming Convention
Standard Format:
[ProjectNum]_[Category]_[Description]_[Date]_[Rev]
Examples:
PRJ001_RFI_023_FoundationSize_20260201.pdfPRJ001_SUB_09510_ACT_CeilingTiles_Rev2.pdfPRJ001_MTG_OAC_20260215_Minutes.pdf
Rules:
- No spaces (use underscores)
- Date format: YYYYMMDD
- Revision noted: Rev1, Rev2
- Clear, descriptive names
Document Distribution
Transmittal Required For:
- Drawings
- Specifications
- Submittals
- Contracts
- Major correspondence
Transmittal Log:
| Trans # | Date | To | Description | # Copies |
|---|---|---|---|---|
| T-001 | 1/15 | ABC Elec | IFC Drawings | 2 sets |
Distribution Methods:
- Email (most common)
- Project management system
- Hard copy (signed receipt)
- FTP/cloud share
Email Management
Email Rules:
- Use clear subject lines
- Include project number
- Save project-related emails
- File in correspondence folder
Archiving:
- Archive monthly (minimum)
- Export important chains
- Save with attachments
Backup Requirements
Backup Frequency:
- Cloud sync: Continuous
- Server backup: Daily
- External backup: Weekly
Backup Locations:
- Cloud storage (primary)
- Server (secondary)
- External drive (disaster recovery)
Related Documents
- File Naming Standards
- Email Guidelines
- Records Retention Schedule
Template provided by support.construction. Customize with your company information.