Site Logistics Planning
Document Type: Procedure
Version: 1.0
Last Updated: February 2026
Distribute To: Superintendents, Project Managers
Purpose
Establish procedures for planning and managing site logistics to support efficient construction operations.
Site Logistics Components
Key Elements:
- Site access and circulation
- Material staging and storage
- Equipment placement
- Temporary facilities
- Safety and security
- Utilities
- Environmental controls
Site Logistics Plan
When to Develop:
- During preconstruction
- Update at major phases
- Review monthly
Plan Contents:
-
Site Plan Drawing
- Property boundaries
- Building footprint
- Access points
- Staging areas
- Storage locations
- Equipment positions
- Temporary facilities
- Pedestrian routes
- Vehicle routes
-
Written Procedures
- Delivery scheduling
- Material handling
- Security protocols
- Emergency access
Site Access
Vehicle Access:
| Element | Considerations |
|---|---|
| Entry points | Location, capacity, hours |
| Traffic flow | One-way, two-way, turns |
| Road condition | Stabilized, paved, gravel |
| Weight limits | Bridge capacity, soil conditions |
| Height restrictions | Overhead lines, structures |
| Public interface | Flag persons, signage |
Pedestrian Access:
- Separate from vehicles when possible
- Defined walkways
- Signage
- Safety barriers
Delivery Scheduling:
- Schedule major deliveries
- Stagger to prevent congestion
- Coordinate with work activities
- Communicate requirements
Material Staging
Staging Area Planning:
Considerations:
- Size needed per phase
- Proximity to installation
- Protection from weather
- Security requirements
- Ground conditions
- Access for unloading
Material Types:
| Material | Staging Needs |
|---|---|
| Steel/structural | Crane access, blocking |
| Mechanical equipment | Protection, rigging access |
| Finishes | Interior, climate control |
| Electrical | Secure, organized |
| Drywall | Flat, dry, close to install |
| Concrete forms | Organized, near use |
Just-In-Time Delivery:
- Minimize on-site storage
- Coordinate with schedule
- Reduce handling
- Protect materials
Equipment Placement
Planning Considerations:
| Equipment | Placement Factors |
|---|---|
| Tower crane | Coverage, foundations, swing |
| Mobile crane | Access, setup, ground conditions |
| Hoist | Location, capacity, timing |
| Concrete pump | Reach, access, cleanup |
| Generators | Noise, exhaust, fuel access |
Equipment Schedule:
- When needed
- How long on site
- Access requirements
- Removal timing
Temporary Facilities
Field Office:
| Requirement | Typical |
|---|---|
| Size | Based on team size |
| Location | Visible, accessible |
| Utilities | Power, data, water |
| Features | Meeting space, plan room |
Worker Facilities:
- Break areas
- Restrooms (OSHA requirements)
- Drinking water
- Warming/cooling areas
- First aid station
Storage:
- Tool storage (secure)
- Material storage
- Flammable storage
- Waste containers
Temporary Utilities
Power:
| Need | Solution |
|---|---|
| Construction power | Temp service, generator |
| Office power | Same or separate |
| Tool power | Distribution, GFCIs |
Water:
- Source (temp connection, tank)
- Distribution
- Testing/flushing needs
Sanitary:
- Portable toilets (1:20 workers minimum)
- Handwash stations
- ADA accessible units
Safety Considerations
Site Safety:
- Perimeter fencing
- Controlled access
- Signage
- Emergency routes
- Fire access lanes
Traffic Safety:
- Speed limits
- Pedestrian separation
- Backing safety
- Spotter requirements
Security
Security Measures:
| Measure | When |
|---|---|
| Fencing | Always (minimum) |
| Locked gates | After hours |
| Security guards | High-risk sites/phases |
| Cameras | Valuable materials, high risk |
| Lighting | Perimeter, entries |
Theft Prevention:
- Secure storage
- Inventory tracking
- Delivery verification
- Tool tracking
- Lighting
Environmental Controls
Stormwater (SWPPP):
- Erosion controls
- Sediment controls
- Tracking controls
- Materials storage
Dust Control:
- Water trucks
- Stabilization
- Covered loads
Noise/Hours:
- Local restrictions
- Neighbor communication
- Schedule accordingly
Site Logistics Plan Template
================================================================
SITE LOGISTICS PLAN
================================================================
Project: ___________________________________________________
Phase: ____________________________________________________
Date: _____________________________________________________
================================================================
SITE ACCESS:
Main entry: _______________________________________________
Delivery entry: ____________________________________________
Hours: ____________________________________________________
Restrictions: ______________________________________________
STAGING AREAS:
Area 1: _________________ Use: ____________________________
Area 2: _________________ Use: ____________________________
Area 3: _________________ Use: ____________________________
EQUIPMENT:
☐ Tower crane Location: _______________________________
☐ Mobile crane Access: ________________________________
☐ Hoist Location: _______________________________
☐ Other: __________________________________________________
TEMPORARY FACILITIES:
☐ Field office Location: _______________________________
☐ Restrooms (#__) Location: _______________________________
☐ Break area Location: _______________________________
☐ Storage Location: _______________________________
UTILITIES:
☐ Power Source: ________________________________
☐ Water Source: ________________________________
☐ Data Provider: _______________________________
SECURITY:
☐ Fencing Type: __________________________________
☐ Lighting
☐ Cameras
☐ Guards Hours: _________________________________
================================================================
Plan Attached: ☐ Yes
Prepared By: _______________________ Date: ________________
Approved By: ______________________ Date: ________________
================================================================
Phase Transitions
Update Plan When:
- Major phase changes
- New subcontractors mobilize
- Equipment changes
- Access changes
- Owner/tenant occupancy
Related Documents
- Project Startup
- Safety Requirements
- Environmental Compliance
- Subcontractor Coordination
Software Integration
BLDR Pro:
- Site plan documentation
- Delivery scheduling
- Photo documentation
- Communication
Template provided by support.construction. Good logistics enable efficient construction.