✅ Project Closeout Checklist
A comprehensive checklist to ensure nothing is missed during project closeout.
Why Use a Closeout Checklist?
Project closeout is where money goes to die. Incomplete closeout means:
- Retainage held indefinitely
- Final payment delayed
- Warranty disputes
- Unhappy clients (no referrals)
This checklist ensures you collect what you're owed and leave a good impression.
Phase 1: Pre-Closeout (30 Days Before Substantial Completion)
Administrative
- Review contract for closeout requirements
- Identify all required closeout documents
- Request closeout submittals from subcontractors
- Schedule pre-final inspection with owner/architect
- Compile as-built drawings
- Gather all warranties and guarantees
- Prepare operation & maintenance manuals
Financial
- Review all outstanding change orders — get signed
- Identify unbilled work — submit final pay apps
- Calculate final contract value
- Review T&M work — ensure documented
- Reconcile job costs vs. budget
- Identify any backcharges to issue/resolve
Subcontractor Coordination
- Issue punch list requirements to subs
- Collect lien waivers (conditional) from subs
- Verify sub insurance certificates current
- Confirm sub warranty documents received
- Schedule sub participation in commissioning
Phase 2: Substantial Completion
Punch List
- Schedule punch list walkthrough with owner/architect
- Complete punch list documentation
- Issue punch list items to responsible parties
- Set deadline for punch completion
- Track punch list progress daily
- Verify completed items
- Final punch walkthrough — get sign-off
Inspections & Approvals
- Final building inspection — obtain CO
- Fire marshal inspection (if required)
- Health department inspection (if required)
- Elevator inspection (if applicable)
- ADA compliance verification
- Environmental closeout (if required)
- LEED documentation (if applicable)
Testing & Commissioning
- HVAC testing, adjusting, balancing (TAB)
- Plumbing pressure tests
- Electrical testing and panel schedules
- Fire alarm testing
- Fire sprinkler testing
- Security system testing
- Building automation verification
- Generator/emergency power test
Phase 3: Documentation Package
As-Builts & Record Documents
- Marked-up drawing sets collected from field
- As-built drawings prepared (CAD/PDF)
- Specification changes documented
- RFI log — final version
- Change order log — final version
- Submittal log — final version
Operation & Maintenance Manuals
- Equipment O&M manuals
- Product data sheets
- Warranty information
- Spare parts lists
- Maintenance schedules
- Emergency contact list
- System diagrams and schematics
Warranties & Guarantees
- Contractor general warranty letter
- Roofing warranty (often separate/extended)
- HVAC equipment warranties
- Manufacturer warranties compiled
- Subcontractor warranties
- Extended warranties (if purchased)
Certifications & Test Reports
- Concrete test reports
- Steel certifications
- Soil compaction reports
- Special inspection reports
- HVAC TAB report
- Commissioning report
- Fire protection certifications
Phase 4: Training & Turnover
Owner Training
- HVAC system operation
- Building automation/controls
- Fire/life safety systems
- Security system
- Plumbing systems (if complex)
- Electrical systems (generators, etc.)
- Landscape/irrigation (if applicable)
Training Documentation
- Sign-in sheets for all training sessions
- Video recordings (if required)
- Quick reference guides provided
- Emergency procedures reviewed
- Maintenance schedule explained
- Warranty claim procedures explained
Keys & Access
- Final keying complete
- Key schedule/bitting chart
- Keys turned over to owner
- Access cards/fobs programmed
- Master key documentation
- Security codes transferred
Phase 5: Financial Closeout
Pay Applications
- Submit final pay application
- Include all completed change orders
- Attach required lien waivers
- Submit retainage release request
- Verify stored materials billed
- Reconcile all billings
Lien Waivers
- Conditional final waiver submitted (with final pay app)
- Subcontractor conditional finals collected
- Upon payment: Unconditional final waiver
- Subcontractor unconditional finals collected
- Supplier unconditional finals collected
Cost Reconciliation
- Final job cost report completed
- Compare budget vs. actual
- Document lessons learned
- Calculate final profit/loss
- Close out job in accounting system
- Archive financial records
Phase 6: Site Closeout
Demobilization
- Remove temporary facilities (trailer, etc.)
- Remove temporary utilities
- Remove temporary fencing
- Remove all equipment from site
- Clean up storage/laydown areas
- Return rented equipment
Final Cleanup
- Construction debris removed
- Interior cleaning complete
- Window cleaning complete
- Final vacuum/mop
- Exterior cleanup complete
- Landscaping areas cleaned
Site Restoration
- Paving/striping complete
- Landscaping installed/complete
- Irrigation operational
- Signage installed
- Site lighting operational
- Fencing/gates operational
Phase 7: Project Archive
Documentation Archive
- Contract documents archived
- Drawings (original + as-built) archived
- Specifications archived
- Correspondence files archived
- Meeting minutes archived
- Photos organized and archived
- Daily reports archived
- Inspection reports archived
Financial Archive
- Pay applications archived
- Change orders archived
- Lien waivers archived
- Insurance certificates archived
- Final cost report archived
- Budget vs. actual archived
Digital Backup
- All files backed up to server
- Project management software data exported
- Photos/videos backed up
- Email correspondence saved
Retention Period
Keep project records for the duration of the warranty period PLUS the statute of limitations (often 4-10 years depending on state). When in doubt, keep it longer.
Closeout Transmittal Checklist
Use this when formally submitting closeout package:
CLOSEOUT TRANSMITTAL
Project: _________________________________
Date: ____________________________________
Submitted By: ____________________________
Enclosed documents:
□ Certificate of Substantial Completion
□ Certificate of Occupancy (copy)
□ As-Built Drawings (__ sets)
□ O&M Manuals (__ volumes)
□ Warranty Compilation
□ Training Sign-off Sheets
□ Final Lien Waivers
□ Final Pay Application
□ Keys and Key Schedule
□ Spare Parts and Attic Stock
□ Other: _______________________
By signing below, Owner acknowledges receipt of the above:
_____________________ ___________
Owner Signature Date
Common Closeout Problems
| Problem | Prevention |
|---|---|
| Missing submittals | Track from day one, not closeout |
| Sub won't provide waiver | Withhold their final payment |
| Punch list drags on | Set hard deadlines with consequences |
| Missing warranties | Require before final payment |
| O&M manuals incomplete | Spec requirements clearly upfront |
| Retainage held | Follow up weekly, escalate |
| No CO issued | Track inspection schedule early |
Start Early
Closeout starts at project kickoff, not substantial completion. Track submittals, warranties, and O&M requirements from day one.