✅ Project Startup Checklist
A comprehensive checklist to ensure your project starts right. Good project startup prevents problems during construction and closeout.
Why Project Startup Matters
Starting a project well prevents:
- Payment problems (missing notices, wrong paperwork)
- Schedule delays (permits, submittals, long-lead items)
- Cost overruns (missed scope, bad estimates)
- Relationship damage (miscommunication, unclear expectations)
The First 30 Days
The first 30 days set the tone for the entire project. Invest time upfront to avoid problems later.
Phase 1: Pre-Construction (Before Mobilization)
Contract & Legal
- Signed contract received and reviewed
- Contract amount matches proposal/bid
- Scope of work clearly defined
- Exclusions documented
- Payment terms understood (retention, billing dates)
- Change order procedures defined
- Insurance requirements identified
- Bond requirements identified (if any)
- Indemnification clauses reviewed by counsel
- Warranty terms understood
Lien Rights Protection
- Preliminary notice sent (if required by state)
- Lien deadline calendar created
- Property owner information verified
- GC/lender information documented
- Notice requirements for each tier understood
Insurance & Bonding
- Insurance certificates sent to GC/owner
- COI names additional insureds correctly
- Workers' comp certificate provided
- Auto insurance certificate provided
- Excess/umbrella coverage confirmed
- Bonds ordered (if required)
- Bond forms match contract requirements
Project Team Setup
- Project manager assigned
- Superintendent assigned
- Project engineer assigned (if applicable)
- Key contacts list created
- Emergency contact list created
- Communication protocols established
- Reporting requirements understood
Phase 2: Project Setup (Week 1)
Administrative Setup
- Job number created in accounting system
- Project folder/file structure created
- Document control system set up
- Drawing log started
- RFI log created
- Submittal log created
- Change order log created
- Daily report template ready
Schedule of Values
- Schedule of Values (SOV) prepared
- SOV submitted for approval
- Line items match contract scope
- Appropriate level of detail
- Change order provisions included
- Billing format approved
Budget Setup
- Project budget created
- Cost codes assigned
- Labor budget by phase
- Material budget by category
- Subcontract values entered
- Equipment budget established
- Contingency allocated
- Profit margin identified
Subcontractor Coordination
- Subcontracts issued
- Subcontractor insurance received
- Subcontractor licenses verified
- Scope letters/exhibits attached
- Payment terms communicated
- Scheduling requirements communicated
- Safety requirements communicated
Phase 3: Document Review (Week 1-2)
Drawings Review
- All drawing sheets received
- Latest revision confirmed
- Drawing log created with issue dates
- Architectural drawings reviewed
- Structural drawings reviewed
- MEP drawings reviewed
- Civil/site drawings reviewed
- Conflicts/issues noted
Specifications Review
- All specification sections received
- Submittal requirements extracted
- Product substitutions identified
- Quality requirements noted
- Testing requirements identified
- Closeout requirements noted
Existing Conditions
- Site visit completed
- Existing conditions documented (photos)
- Access routes confirmed
- Utility locations identified
- Adjacent property conditions documented
- Pre-construction survey (if needed)
Phase 4: Submittals & Long-Lead Items (Week 1-2)
Submittal Schedule
- Submittal log created from specs
- Long-lead items identified
- Submittal schedule created
- Submittal responsibilities assigned
- Review times built into schedule
Long-Lead Items Ordered
Priority items to release immediately:
- Structural steel
- Elevators
- Electrical switchgear
- Generators
- Mechanical equipment
- Custom millwork
- Specialty doors/hardware
- Custom light fixtures
- Curtain wall systems
Product Selections
- Owner selections complete
- Allowance items identified
- Substitutions approved
- Color/finish selections made
- Samples submitted/approved
Phase 5: Site Mobilization
Permits & Approvals
- Building permit obtained
- Demolition permit (if needed)
- Grading permit (if needed)
- Street/sidewalk permit (if needed)
- Utility connection permits
- Fire department approval
- SWPPP/erosion control plan (if needed)
Site Setup
- Site access established
- Temporary fencing installed
- Project signage posted
- Office trailer delivered/setup
- Temporary power established
- Temporary water established
- Temporary toilets placed
- Dumpster/waste containers placed
- Tool storage secured
- Material laydown area designated
Safety Setup
- Site-specific safety plan created
- OSHA posting requirements met
- First aid kit on site
- Fire extinguishers placed
- Emergency numbers posted
- Safety orientation materials ready
- PPE requirements posted
- Jobsite safety rules posted
Phase 6: Kickoff Meeting
Internal Kickoff
Hold with your team before owner kickoff:
- Project scope reviewed
- Schedule reviewed
- Budget reviewed
- Team roles clarified
- Risk areas discussed
- Quality standards established
- Communication plan confirmed
- Questions answered
Owner/GC Kickoff Meeting
Agenda items to cover:
- Introductions and roles
- Project scope confirmation
- Schedule review and milestones
- Communication protocols
- Meeting schedule established
- RFI/submittal procedures
- Change order procedures
- Pay application procedures
- Site access and logistics
- Safety requirements
- Quality expectations
- Closeout requirements preview
Meeting Documentation
- Meeting minutes distributed
- Action items assigned
- Decisions documented
- Open issues tracked
Phase 7: Schedule Development
Master Schedule
- Master schedule developed
- Milestones identified
- Critical path identified
- Subcontractor input obtained
- Owner approval received
- Schedule distributed to team
Look-Ahead Schedule
- 3-week look-ahead created
- Updated weekly
- Distributed at OAC meetings
Key Dates Tracked
- Substantial completion date
- Final completion date
- Liquidated damages trigger
- Owner move-in date
- Permit expiration dates
- Inspection milestones
Phase 8: Communication Setup
Meetings Scheduled
- OAC meeting schedule (weekly/biweekly)
- Foreman meeting schedule
- Safety meeting schedule
- Subcontractor coordination meetings
Technology Setup
- Project management software access
- Drawing viewer/BIM access
- File sharing access
- Team email list created
- Photo documentation system
Reporting Schedule
- Daily report procedures
- Weekly progress report format
- Monthly progress photos
- Pay application schedule
Common Startup Mistakes to Avoid
| Mistake | Consequence | Prevention |
|---|---|---|
| Missing preliminary notice | Lost lien rights | Send day 1 |
| Not reviewing contract | Surprise terms | Review before signing |
| Late submittals | Schedule delay | Submit week 1 |
| No kickoff meeting | Miscommunication | Schedule before start |
| Skipping site survey | Unknown conditions | Document pre-construction |
| Wrong insurance | Coverage gaps | Verify requirements |
| No budget setup | Cost surprises | Set up before billing |
Startup Meeting Checklist (Quick Reference)
Print and bring to kickoff meeting:
□ Contract copy
□ Drawings (latest revision)
□ Specifications
□ Schedule
□ Schedule of Values
□ RFI log
□ Submittal schedule
□ Contact list
□ Safety plan
□ Meeting agenda
□ Note-taking materials